 F02 passes under the bow-string bridge at Trentham on a brilliant sunny day. |
 F04. Making sure the pan is lowered at Upper Hutt. |
 F04 departs Upper Hutt in a cloud of smoke and with the pan down. |
 F06 with the Capital Connection carriages climbs the grade out of Upper Hutt. |
 F08 passes the Maymorn platform at low speed. There is restricted clearance from this structure. |
 F08 about to disappear under the Rimutaka Range in a cloud of smoke. |
 1614 approaches the portal of the 8km Rimutaka tunnel. Note the group of photographers. |
 F10 in the Maymorn Valley. The 572m Maoribank tunnel passes through the ridge in the background (below the belt of pine trees) giving access to the Upper Hutt Valley |